Hydro Electric Project
Status
Completed
Project Type
Commercial
Project Area
-
Price Range
-

Project description
The Papanasam Hydroelectric Power Plant is a landmark renewable energy project located in the Western Ghats of Tamil Nadu. Developed to harness the hydropower potential of the Thamirabarani River basin, the facility plays a vital role in generating clean electricity while supporting regional water resource management. The project combines robust engineering, sustainable power generation, and environmental stewardship.
Commissioned as one of Tamil Nadu’s earliest hydroelectric developments, the plant continues to contribute reliable renewable energy to the state’s power grid. Its infrastructure includes a dam, reservoir, water conveyance systems, and power generation units designed to maximize efficiency. Surrounded by rich biodiversity and scenic landscapes, the project stands as a testament to sustainable infrastructure development and long-term energy security.
Key Details
- Location: Papanasam, Tirunelveli District, Tamil Nadu, India.
- Installed Capacity: 32 MW.
- Number of Units: 4 generating units of 8 MW each.
- Special Features: Hydroelectric generation, gravity dam, reservoir system, and renewable energy infrastructure.
- Benefits: Clean energy production, irrigation support, water management, and regional development.